A substation can only be as reliable as the cable feeding it. We run condition-based cable testing on medium-voltage feeders, terminations, and splices — with results that engineers can actually act on, not just pass-fail.

What we test
  • VLF tan delta and dissipation factorIEEE 400.2
  • Offline partial discharge surveyIEEE 400.3 / IEEE 400.4
  • Polarization index and insulation resistance
  • DC HiPot withstand testingIEEE 400.1
  • Cable identification and phasing
  • Termination and splice inspection
Standards we follow

IEEE 400 (parts 1, 2, 3, 4) · IEEE 510 · NFPA 70B

Apparatus covered

Shielded power cable from 5 kV through 35 kV. EPR, XLPE, and PILC constructions. New and aged cable.

Reports you get

Every visit ends with a documented report: raw test data, calibrated instrument records, anomaly findings with severity ranking, photos, and a clear recommended-action list. Trends are tracked across visits.

Need this on your substation?

Send a scope or a list of assets and we’ll respond within one business day with crew availability and a proposal.

Request a Quote →
Other field services
Field Services
Acceptance Testing

Documented acceptance tests on new substation equipment before energization.

Field Services
Maintenance Testing

NFPA 70B and IEEE-aligned periodic testing to keep substation equipment in service.

Field Services
Transformer Field Testing

DGA, oil quality analysis, TTR, Doble power factor, and SFRA on power transformers.

Field Services
Circuit Breaker Field Testing

Contact resistance, timing, HiPot, and primary injection on oil, vacuum, and air breakers.

Field Services
Infrared Thermography

Thermographic surveys of energized substations with documented anomaly reports.

Field Services
Battery & DC Systems

IEEE 450 / 1188 testing on station batteries, chargers, and DC distribution.

Field Services
Substation Inspections

Routine and detailed walkdowns — safety, asset condition, NERC PRC-005 readiness.