An infrared thermography survey catches loose connections, overloaded conductors, and degrading equipment while they’re still cheap to fix. Detailed reports include emissivity, ambient, load, and severity classification for every anomaly.
NFPA 70B — 11.17 · IEC TS 62446 (PV systems)
Energized substations, switchyards, indoor switchgear, plant electrical distribution, motor control centers.
Every visit ends with a documented report: raw test data, calibrated instrument records, anomaly findings with severity ranking, photos, and a clear recommended-action list. Trends are tracked across visits.
Send a scope or a list of assets and we’ll respond within one business day with crew availability and a proposal.
Documented acceptance tests on new substation equipment before energization.
NFPA 70B and IEEE-aligned periodic testing to keep substation equipment in service.
DGA, oil quality analysis, TTR, Doble power factor, and SFRA on power transformers.
Contact resistance, timing, HiPot, and primary injection on oil, vacuum, and air breakers.
VLF tan delta, partial discharge, insulation resistance, and HiPot on medium-voltage cable.
IEEE 450 / 1188 testing on station batteries, chargers, and DC distribution.
Routine and detailed walkdowns — safety, asset condition, NERC PRC-005 readiness.