A trained set of eyes through a substation every quarter catches what test equipment misses — oil leaks, corroded steel, broken arresters, missing labels, missing PPE in the control house. We run inspection rounds aligned with utility procedures and NERC PRC-005 requirements, with photographic reports.
NERC PRC-005 (Protection System Maintenance) · IEEE C2 (National Electrical Safety Code) · NFPA 70B
Distribution and transmission substations, switchyards, plant substations, collector substations.
Every visit ends with a documented report: raw test data, calibrated instrument records, anomaly findings with severity ranking, photos, and a clear recommended-action list. Trends are tracked across visits.
Send a scope or a list of assets and we’ll respond within one business day with crew availability and a proposal.
Documented acceptance tests on new substation equipment before energization.
NFPA 70B and IEEE-aligned periodic testing to keep substation equipment in service.
DGA, oil quality analysis, TTR, Doble power factor, and SFRA on power transformers.
Contact resistance, timing, HiPot, and primary injection on oil, vacuum, and air breakers.
VLF tan delta, partial discharge, insulation resistance, and HiPot on medium-voltage cable.
Thermographic surveys of energized substations with documented anomaly reports.
IEEE 450 / 1188 testing on station batteries, chargers, and DC distribution.